Online Services | Commonwealth Sites | Help | Governor

DCR - Virginia Department of Conservation and Recreation
Contact Us
Home
State Parks
Soil and Water
Conservation
Natural Heritage
Dam Safety and
Floodplain Management
Outdoor Recreation
Planning, Trails
and Grants
Chesapeake Bay
Local Assistance
Land Conservation
Boards and
Foundations
Special Events
Jobs
About Us
SOIL & WATER CONSERVATION
SWCD Dam Owner Resource for Reference and Training

Under construction

Abbreviations Used:
ASDSO, Association of State Dam Safety Official
DDS, Division of Dam Safety
DDSC, District Dam Safety Consultant
EAP, Emergency Action Plan
eVa, Commonwealth of Virginia on-line Purchasing
NIGP, National Institute of Governmental Purchasing Codes
NOAA, National Oceanic and Atmospheric Administration
NOIRA, Notice of Intended Regulatory Action
PE, Professional Engineer
VLWA, Virginia Lakes and Watershed Association
  1. Links to Useful Dam Safety Websites
    1. State Law (Chapter 6 of Title 10.1: Floodplain Protection and Dam Safety)
    2. Notice of Intended Regulatory Action
    3. DCR Dam Safety and Floodplain Management
    4. National Hurricane Center
    5. IFLOW Data for Virginia

  2. PowerPoint Presentations
    1. Dam Nomenclature, Parts of a Dam (PDF)
    2. Maintenance – PowerPoint presentation (PDF)
    3. Emergency Action Planning – PowerPoint presentation (PDF)

  3. Basic Federal Program Information
    1. General Information (PDF)
    2. Pilot Program (PDF)
    3. PL-534 (PDF)
    4. PL-566 (PDF)
    5. Rehabilitation Program (PDF)

  4. What documents should be in each dam’s file?
    1. Watershed Agreement
    2. Memorandum of Understanding
    3. Easement(s)
    4. Current Emergency Action Plan
    5. Current Operation and Maintenance Application
    6. Current Reinspection Report or Inventory Report
    7. Current (and all previous) O and M Certificates
    8. Maintenance Log
    9. Site Inspection Log
    10. Landowner Contact Information
    11. Directions to the dam
    12. Time Lines for Inspections
      1. Inspection Schedule (Attached to O and M Certificate)
    13. Easement Change Requests
      1. Upstream Basin
      2. Downstream Basin

  5. Process for Dam Certification
    1. Application procedure recertification
    2. Application procedure PE inspection
    3. Application procedure owner’s annual inspection
    4. Who provides what function
    5. Time frames involved
    6. General contact information

  6. Sample Forms in Microsoft Word Format
    1. Operation and Maintenance Application (filled out by DDSC, signed by SWCD)
      1. Standard Form
      2. Appendix Samples
        1. Standard Plunge Pool
        2. Impact Basin
    2. Emergency Action Plan (draft by DDSC, completion and signed by SWCD and Co.)
    3. Reinspection Report (by DDSC)
    4. Inventory Report (by DDSC)
    5. Dam Rehabilitation Program Entry Forms (completed by SWCD)
      1. Application for Federal Assistance (sf424)
      2. (Project Name) Dam Rehabilitation Application Information
    6. Owner’s Annual Inspection (completed by SWCD)
    7. Others as requested

  7. Model – Owners Annual Inspection
    1. Who to invite
    2. How to run it
    3. Who takes the lead
    4. Video Link for Inspections and EAPs

  8. Purchasing Statement
    1. eVa’s NIGP codes as related to dam maintenance/construction
    2. General Procurement Process

  9. Funding Sources
    1. Grant Opportunities
    2. Legislature
    3. County/Municipality
    4. Landowners
    5. NOAA

  10. Spraying for Vegetation Control
    1. Different chemicals available, with use restrictions
    2. Chemical application requirements
    3. Certifications required/recommended

  11. Upcoming Dam Safety Training
    1. ASDSO
    2. VLWA
    3. DDS
    4. Private Consultants Offering Training

  12. Frequently asked Questions
    1. Why do I have to cut trees that are not on the dam?

  13. District Legal Representation
    1. Attorney General
    2. Local Commonwealth Attorney

  14. Other